The last time we fired this kiln, we had a tough time keeping it in a sufficiently strong reduction. This I blamed on a very loose door of castable bricks, so we took steps after we loaded to address the problem. Using door mud (50% fire clay, 50% alumina) we filled in the gaps, then papered over the door with newspaper dipped in a slurry of recycled clay:
Relaxing while waiting for cones to fall:
Adding the soda mix:
We had no trouble reducing this time! Unloading Sunday. In the pouring rain, probably. I'll keep you "posted."
Why does it look like you are relaxing and Doug is doing ALL the work...?
ReplyDelete